The Electrical Installation Certificate (EIC) under BS 7671:2018+A4:2026 has new sections, new earthing-arrangement tick-boxes, an expanded Schedule of Inspections (items 1.0 through 14.0 including the new Prosumer LV installation item) and updated terminology. This guide walks every change visible on the canonical IET form.
What changed on the BS 7671 A4:2026 Electrical Installation Certificate (EIC)?
The A4:2026 EIC adds item 14.0 "Prosumer's low voltage electrical installation(s)" to the Section H Schedule of Inspections (now 1.0 to 14.0), splits the TN-C-S earthing tick-box into PME and PNB, and keeps the three-signatory Design / Construction / Inspection & Testing structure. Item 6.0 also covers the 30 mA RCD requirement for domestic luminaire final circuits (Regulation 411.3.4, in place since BS 7671:2018).
2,600+
UK electricians
“Replaced three separate apps with Elec-Mate. Certs, quotes, and scheduling all in one place.”
Key takeaways
01The EIC is the certificate issued for new electrical installations, additions and alterations — it is NOT the same as the EICR (which records the condition of an existing installation).
02Section H Schedule of Inspections under A4:2026 covers items 1.0 through 14.0 — item 14.0 is the new "Prosumer's low voltage electrical installation(s)" inspection point.
03Section F earthing-arrangement tick-boxes now distinguish TN-C-S (PME) from TN-C-S (PNB) — same change as on the EICR.
04Section C splits certification responsibility into Design, Construction, and Inspection & Testing — three separate signatures with separate liability statements per Regulations 120.3, 133.1.2, 133.1.3 and 133.5.
05Section G records Means of Earthing, Maximum Demand, Earth Electrode details, Main Protective Conductors and Main Switch in one consolidated block.
06Schedule of Circuit Details and Schedule of Test Results that accompany the EIC use the same updated layout as the EICR — reference method, maximum permitted Zs, SPD type per board, and a dedicated AFDD test column.
01 · A4:2026 EIC Model Form
What an EIC Is and When You Issue One
An Electrical Installation Certificate (EIC) is issued for new electrical installation work, additions, and alterations to an existing installation. It is the design-construction-inspection record of work being put into service, and it must be issued under BS 7671 before the installation can be safely energised and used.
EIC vs EICR — different documents, different purposes
The EIC certifies new work or alterations meeting BS 7671. The EICR (Electrical Installation Condition Report) records the condition of an existing installation at a point in time. The EIC has design and construction signatures; the EICR has inspection and testing signatures only.
New installation — the initial certification of a complete new installation. Issue an EIC.
Addition or alteration introducing a new circuit — extending an existing installation with one or more new circuits. Issue an EIC.
Consumer unit / distribution board replacement — a board swap is explicitly an EIC job under the A4:2026 form notes, even where no new final circuit is added.
Multiple additions / alterations / remedial works that do not extend to new circuits — may be certified on a single EIC as an alternative to issuing multiple MEIWCs.
Periodic inspection of an existing installation — never an EIC. Use an EICR (Electrical Installation Condition Report).
The original EIC is issued to the person ordering the work and a duplicate is retained by the person issuing the certificate (Regulation 644.4). The certificate is only valid once the Schedule of Inspections is completed and the relevant Schedule(s) of Circuit Details and Schedule(s) of Test Results are attached (Regulation 644.3).
Free download · PDF
Get the BS 7671 A4:2026 Cheat Sheet — free
Every key change in the 2026 amendment on one page. AFDDs, TN-C-S protection, new schedule columns, model forms. Pinned on your van dash.
Every regulation change summarised
New model forms (EIC + MEIWC)
Free PDF — no subscription
02 · A4:2026 EIC Model Form
Section C — Three Separate Certification Signatories
A4:2026 retains the three-signatory structure that distinguishes EIC liability. Each role attests to compliance with BS 7671:2018 amended to the relevant date, subject to any documented departures (Regulations 120.3, 133.1.2, 133.1.3 and 133.5):
For Design — Designer 1 (and Designer 2 where mutual responsibility for design exists). Attests that the design work is compliant. Departures from BS 7671 and permitted exceptions per Regulation 411.3.3 (with attached risk assessment) are recorded here.
For Construction — Constructor. Attests that the installation has been constructed in accordance with the design and BS 7671. Departures from BS 7671 detected during construction are recorded.
For Inspection and Testing — Inspector. Attests that the inspection and testing work has been carried out in accordance with BS 7671 and the Schedule of Inspections.
Section E expands signatory details
Section E records full name, address, postcode and telephone number for each signatory in Section C (Designer 1, Designer 2 where applicable, Constructor, Inspector). This makes the chain of responsibility for the installation explicit — critical for warranty, insurance and future investigation.
03 · A4:2026 EIC Model Form
Section F — Earthing Arrangement (PME vs PNB)
Section F of the A4:2026 EIC has the same earthing-arrangement tick-box list as the EICR:
TN-C — combined PEN throughout (rare in UK).
TN-S — separate N and PE throughout.
TN-C-S (PME) — protective multiple earthing: the supply PEN conductor is earthed at two or more points (BS 7671 Figure 3.9A).
TN-C-S (PNB) — protective neutral bonding: one point in the network where consumers' installations connect to a single source, with the PEN earthed at a single point close to the consumer's supply terminals (Figure 3.9B).
TT — installation earth electrode, no distributor earth.
IT — isolated/IT system.
Other supply parameters in this section: Number and type of live conductors (AC: 1-, 2-, 3-phase 3-wire or 4-wire, with confirmation of polarity; DC: 2-wire or 3-wire), nominal voltage U/U₀, frequency, prospective fault current Ipf, external earth fault loop impedance Ze, and the supply protective device characteristics (BS EN, type, rated current, breaking capacity).
04 · A4:2026 EIC Model Form
Section G — Particulars of Installation
Section G consolidates the installation's headline characteristics in one block:
Means of Earthing — tick-box for Distributor's facility or Installation earth electrode.
Maximum Demand (load) — recorded in kVA or A (delete as appropriate).
Details of Installation Earth Electrode — where applicable: type (rod, tape etc.), location, and electrode resistance / impedance R_A or Z_e.
Main Protective Conductors — earthing conductor material and CSA, main protective bonding conductor material and CSA, with connection/continuity verified tick-boxes.
Bonding destinations — tick-boxes for water, gas, oil installation pipes, structural steel, lightning protection system, and "Other" with specify field.
Main switch (Isolation device / Switch-fuse / Circuit-breaker / RCD etc.) — location, BS EN, number of poles, current rating, voltage rating, plus either overcurrent device details OR RCD main switch details (Type AC/A/F/B, rated residual operating current IΔn, rated time delay, measured operating time, breaking capacity).
In the app
Try Elec-Mate free for 7 days
19 certificate types, 70+ calculators, RAMS, quoting, invoicing, AI agents, and 46+ training courses — from £6.99/mo.
05 · A4:2026 EIC Model Form
Section H — Schedule of Inspections (Items 1.0 to 14.0)
The A4:2026 EIC Schedule of Inspections in Section H lists 14 inspection items, each requiring an "Outcome (✓ / N/A)" entry:
1.0 Condition of consumer's intake equipment (Visual inspection only) — supplier's cut-out, distributor's seal, isolation device for the consumer.
2.0 Parallel or switched alternative sources of supply — generator backup, UPS, prosumer arrangements with separate supply origins.
3.0 Protective measure: Automatic Disconnection of Supply (ADS) — earthing arrangement, protective device selection, disconnection time verification.
4.0 Basic protection — insulation of live parts, barriers and enclosures.
5.0 Protective measures other than ADS — SELV/PELV, double or reinforced insulation, electrical separation.
12.0 Location(s) containing a bath or shower — Section 701 compliance.
13.0 Other special installations or locations — Part 7 compliance for whichever sections apply.
14.0 Prosumer's low voltage electrical installation(s) — NEW under A4:2026.
EIC outcomes are ✓ / N/A — not condition codes
On the EIC each Schedule of Inspections item takes a simple Outcome entry — a tick to confirm the item is satisfactory, or N/A where it does not apply. This is initial verification of new work, so there are no observation classification codes. The C1 / C2 / C3 / FI condition codes belong to the EICR, which assesses an existing installation. See the A4:2026 Schedule of Tests changes for the measurement columns that accompany this inspection.
06 · A4:2026 EIC Model Form
New Item 14.0 — Prosumer's LV Installation
Item 14.0 is the most distinctive new inspection point on the A4:2026 EIC. It reflects Chapter 82 (introduced at A2:2022), which covers Prosumer's Electrical Installations (PEIs) — low voltage installations that both consume energy from the supply AND produce or store energy that may be exported. BS 7671 defines a prosumer as an entity that can be both a producer and a consumer of electrical energy, combining functions traditionally separated into "consumer" and "generator" installations.
Solar PV + battery storage + grid connection — the canonical prosumer arrangement.
Wind generation + battery + grid for self-consumption with export.
EV-to-grid (V2G) charging where the vehicle battery exports back to the supply at times.
Combined heat and power (CHP) with grid synchronisation.
Hybrid solar/battery installations with islanding capability for grid-fault back-up.
Why prosumer inspection got its own item
Prosumer installations have bidirectional power flow, anti-islanding protection requirements (G98/G99 compliance for grid connection), specific earthing considerations, additional disconnection and isolation requirements, and labelling needs that distinguish "switched off" from "isolated from generation". A dedicated inspection item makes these checks visible and traceable on every EIC.
07 · A4:2026 EIC Model Form
Section D — Next Inspection Recommendation
Section D of the EIC records the designer's recommended periodic inspection interval — the time after which the responsible person should commission the next EICR. The interval is expressed in years or months and is influenced by:
Installation type (domestic, commercial, industrial, special location).
Foreseeable change of use within the recommended interval.
Tenant turnover frequency for rented properties (PRS Regs 2020 implications in England).
Domestic owner-occupied: 10 years. Domestic rented: 5 years (statutory under PRS Regs 2020 in England). Commercial: 5 years. Hospitals: 5 years in general areas, 1 year for medical locations. Caravan parks / marinas: 1 year. Agricultural / horticultural: 3 years (1 year if particularly harsh).
Elec-Mate is my go to app for business and electrical work. It's feature rich without feeling cluttered. A true all in one app for quotes, certs, calculations, RAMS, EICRs, and more. I use it every day without fail, and it makes my workflow much smoother since I'm not jumping between apps anymore. The price-to-feature ratio is excellent. Any issues I've had, the developer responds within the hour and usually fixes them the same day. 100% recommend.
Fantastic app for electricians
I've used the app and the web based version for a while now and it's well worth the investment. If you're an apprentice or experienced Spark give it a go, you won't be disappointed.
Absolutely amazing
I've been using Elec-Mate for a while now, and honestly, it's one of the best apps I've ever downloaded. Every aspect of it feels thoughtfully designed, from the clean and intuitive interface to the powerful features that make everything so easy to manage. It's clear that a lot of care and attention went into building this app, and it shows in every detail.
Trusted by electricians across the UK
Real feedback from electricians and apprentices
“Replaced three separate apps with Elec-Mate. Certs, quotes, and scheduling all in one place.”
Daniel Palmer
Sole Trader · DP Electrical
“I've won two contracts this month because I could turn quotes around same-day with the AI cost engineer.”
Nathan Perry
Electrician · NP Electrical Services
“The study centre got me through my AM2. Mock exams and flashcards are brilliant.”
Jake Pizey
3rd Year Apprentice · Apprentice
7-day free trial
Issue compliant A4:2026 EICs
Elec-Mate ships the full A4:2026 EIC model form — three-signatory workflow, 14 Schedule of Inspections items, prosumer-aware item 14.0, all schedules attached. 7-day free trial.