A4:2026

BS 7671 Amendment 4: every change explained

BS 7671:2018+A4:2026 was issued on 15 April 2026, and the A2 and A3 version was withdrawn on 15 October 2026. This guide lists what Amendment 4 changed, part by part, from the book's own change summary, and flags the rules that are often credited to A4 but came earlier.

Free for 7 days · No charge until day 8 · Cancel anytime · Used by 2,600+ UK electricians

9 min readUpdated 2026-10-28Andrew Moore, Founder of Elec-Mate

Written and reviewed by Andrew Moore, founder of Elec-Mate, against BS 7671:2018+A4:2026, IET Guidance Note 3 and the IET On-Site Guide.

ShareXinW
Follow

The short answer

What changed in BS 7671 Amendment 4?

A4:2026 added TN-C-S (PNB) earthing (Regulation 312.2.1.1), Table 52.1 for cables in walls, a new Chapter 57 for stationary batteries, new Section 545 (ICT functional earthing), new Section 716 (Power over Ethernet), a new Chapter 81 on energy efficiency, a major revision of Section 710 (medical locations) and revised model forms, on which an FI observation no longer has to make an EICR unsatisfactory.

2,600+

UK electricians

“Replaced three separate apps with Elec-Mate. Certs, quotes, and scheduling all in one place.”

Daniel Palmer, DP Electrical · 5 out of 5

Key takeaways

  1. 01Issued 15 April 2026; the A2:2022 + A3:2024 version was withdrawn on 15 October 2026, so new work is designed to BS 7671:2018+A4:2026.
  2. 02New in A4: Chapter 57 (stationary secondary batteries), Section 545 (functional earthing for ICT), Section 716 (Power over Ethernet) and Chapter 81 (energy efficiency, replacing Appendix 17).
  3. 03Earthing: Regulation 312.2.1.1 now includes TN-C-S (PNB) alongside PME, and the model forms list them separately.
  4. 04Cables: requirements for cables in walls and partitions are now in Table 52.1, and Appendix 4 has new reference methods for buried cables.
  5. 05Reports: an FI observation no longer has to be marked unsatisfactory, and an EICR must include guidance for the recipient (Regulation 653.2).
  6. 06Not A4: the AFDD requirement, the single RCD test, the 250 V insulation test after reconnection and the SPD/AFDD form fields came in A2:2022; RCD protection for domestic lighting came in 2018.

01 · A4:2026

Key dates

  • BS 7671:2018 issued July 2018 (in force January 2019).
  • Amendment 1:2020 (Section 722, EV charging), February 2020.
  • Amendment 2:2022, March 2022.
  • Amendment 3:2024 (unidirectional and bidirectional protective devices), July 2024.
  • Amendment 4:2026 issued 15 April 2026 (orange cover). The A2:2022 + Corrigendum + A3:2024 version was withdrawn on 15 October 2026.

Existing installations

The book is clear that installations built to an earlier edition may not comply with A4 in every respect, and that this does not necessarily mean they are unsafe or need upgrading.

Free download · PDF

Get the BS 7671 A4:2026 Cheat Sheet — free

Every key change in the 2026 amendment on one page. AFDDs, TN-C-S protection, new schedule columns, model forms. Pinned on your van dash.

  • Every regulation change summarised
  • New model forms (EIC + MEIWC)
  • Free PDF — no subscription

We'll email it once. No spam — unsubscribe any time.

02 · A4:2026

Parts 2, 3 and 4: definitions, earthing and protection

  • Part 2: terms and definitions expanded and modified, including protective neutral bonding (PNB).
  • Regulation 312.2.1.1: a PNB figure and requirements added. TN-C-S (PNB) is earthed at a single point near the consumer and sits alongside TN-C-S (PME). See our TN-C-S (PNB) vs PME guide.
  • Regulation 421.1.7(a): reworded to "high rise residential buildings". The AFDD requirement itself dates from A2:2022.
  • Regulation 422.2 (protected escape routes): cables meeting 422.2.1 can be installed in a protected corridor; cables in a fire-resisting enclosure are deemed outside the escape route; 422.2.1 now lists the permitted cables.
  • Regulations 434.2.1 and 434.3(a): the term "inherently short-circuit and earth fault proof" introduced, with related changes.
  • Section 444: Annex B443 deleted.

03 · A4:2026

Part 5: selection and erection

  • Table 51: new identification for combined protective and functional earthing conductors, combined protective and functional bonding conductors and functional bonding conductors. Neither FE nor green-and-yellow should be used for a functional bonding conductor.
  • Regulation 521.10.202 (supports against premature collapse): a note added explaining its intent.
  • Section 522: the requirements for cables in a wall or partition are now in Table 52.1.
  • Regulation 536.4.202: redrafted to cover coordination between an LV switchgear assembly and its overload protective device, including load curtailment as one of the conditions.
  • Regulation 537.4.2: firefighter's switches now required where the fire engineer specifies them; 537.4.2.1 deleted.
  • New Section 545: functional earthing and functional equipotential bonding for ICT equipment (minimum sizes, identification, continuity, main functional earthing terminal, bonding ring conductors).
  • Section 551: 551.7.1 gains indents on bidirectional energy flow and on connecting a source to the load side of an RCD; 551.7.2 split in two, with stationary batteries treated as a generating set.
  • Chapter 56: 560.5.3 amended and the 560.6 rules on sources for safety services modified.
  • New Chapter 57: stationary secondary batteries used for storage and supply, excluding batteries inside products such as UPSs and emergency lighting.

04 · A4:2026

Part 6, Part 7 and Part 8

  • Regulation 653.1: the Appendix 6 notes for the person producing the report must be taken into account.
  • Regulation 653.2: an EICR must include guidance for the recipient, and photographs or thermographic images can be appended.
  • Section 710 (medical locations): major revision, including independent supplies for group 2 locations and a schedule for supplementary bonding resistances.
  • New Section 716: ELV DC power over data cabling, including Power over Ethernet. See our Section 716 guide.
  • Regulation 722.421.1.7.201: AFDDs are not required for EV charging equipment to BS EN 61851 with BS EN IEC 62196-2 socket-outlets or connectors.
  • New Chapter 81: energy efficiency, pointing to the Building Regulations and BS HD 60364-8-1. Appendix 17 deleted.

In the app

Try Elec-Mate free for 7 days

19 certificate types, 70+ calculators, RAMS, quoting, invoicing, AI agents, and 46+ training courses — from £6.99/mo.

Download on the App StoreGet it on Google Play

05 · A4:2026

Appendices and model forms

  • Appendix 4: new reference methods for buried cables, depending on whether the cable is in direct contact with soil or in a duct; Tables 4A2, 4D4A, 4E4A, 4H4A and 4J4A revised.
  • Appendix 6: the notes for the person producing a condition report redrafted; signatures confirmed as those of the people who did the inspection and testing and authorised the report; FI no longer needs to be marked unsatisfactory. The forms list TN-C-S (PME) and TN-C-S (PNB) separately.
  • Appendix 13: guidance on cables in protected escape routes redrafted around BS 9991, BS 9999 and the fire engineer's strategy.
  • Appendix 1: the list of referenced standards updated.

06 · A4:2026

Often credited to A4, but older

Several rules that feel new are regularly described as A4 changes. They were already in force before A4:

  • AFDDs required on socket circuits up to 32 A in high rise residential buildings, HMOs, purpose-built student accommodation and care homes: A2:2022.
  • RCD verification by a single AC test at IΔn, and the deletion of Appendix 3 Table 3A: A2:2022.
  • The 250 V DC insulation resistance test after equipment is reconnected (Regulation 643.3.3): A2:2022.
  • SPD and AFDD fields on the model forms, and the split into separate schedules of circuit details and test results: A2:2022.
  • Regulation 411.3.3 redrafted into three indents, with the risk-assessment exception only for sockets in other locations: A2:2022.
  • RCD protection for domestic lighting circuits (Regulation 411.3.4) and the 0.95 Cmin factor behind the maximum Zs tables: the 2018 edition.
  • Unidirectional and bidirectional protective devices (Regulation 530.3.201): A3:2024.

Frequently Asked Questions

What electricians say

Verified reviews from the UK App Store.

One App for Everything!

Elec-Mate is my go to app for business and electrical work. It's feature rich without feeling cluttered. A true all in one app for quotes, certs, calculations, RAMS, EICRs, and more. I use it every day without fail, and it makes my workflow much smoother since I'm not jumping between apps anymore. The price-to-feature ratio is excellent. Any issues I've had, the developer responds within the hour and usually fixes them the same day. 100% recommend.

Apple App Store · GBR

Fantastic app for electricians

I've used the app and the web based version for a while now and it's well worth the investment. If you're an apprentice or experienced Spark give it a go, you won't be disappointed.

Apple App Store · GBR

Absolutely amazing

I've been using Elec-Mate for a while now, and honestly, it's one of the best apps I've ever downloaded. Every aspect of it feels thoughtfully designed, from the clean and intuitive interface to the powerful features that make everything so easy to manage. It's clear that a lot of care and attention went into building this app, and it shows in every detail.

Apple App Store · GBR

Trusted by electricians across the UK

Real feedback from electricians and apprentices

“Replaced three separate apps with Elec-Mate. Certs, quotes, and scheduling all in one place.”

Daniel Palmer

Sole Trader · DP Electrical

“I've won two contracts this month because I could turn quotes around same-day with the AI cost engineer.”

Nathan Perry

Electrician · NP Electrical Services

“The study centre got me through my AM2. Mock exams and flashcards are brilliant.”

Jake Pizey

3rd Year Apprentice · Apprentice

7-day free trial

Work to A4:2026 on every certificate

Elec-Mate's EIC, EICR and Minor Works certificates follow the A4:2026 model forms, including the separate TN-C-S (PME) and TN-C-S (PNB) options. 7-day free trial.

Start your free trial

From £6.99/mo after the trial — no charge until day 8.

“Replaced three separate apps with Elec-Mate. Certs, quotes, and scheduling all in one place.”

Daniel Palmer, DP Electrical · 5 out of 5
  • 7 days free, then from £6.99/mo
  • Cancel in one tap — no calls, no hassle
  • iOS, Android and web
  • Built to BS 7671:2018+A4:2026

Or download the app

Download on the App StoreGet it on Google Play
Certificate types
19Certificate types
Calculators
70+Calculators
Training courses
46+Training courses
AI specialists
8AI specialists