Additional requirements — EV Charging Installation Practice

Free topic-focused mock exam: all 16 questions on Additional requirements, drawn from the wider EV Charging Installation bank. 50-minute timer, 60% to pass, worked explanation on every question. Use this when you've taken the full mock once and want to drill the topics you got wrong.

Questions
16
Time limit
50 min
Pass mark
60% · 10/16
Question bank
16

Free, no sign-up. Retake as many times as you like — the questions are reshuffled, with the answer order changed.

Sample questions

  1. 01A residential survey puts the new maximum demand at 85 A per phase, so you apply through ENA Connect Direct. How long does the DNO have to confirm?
    • A28 days, as for connect and notify
    • B5 working days from the application
    • C3 months, under its licence timescales
    • D10 working days from the application

    Why: For residential properties with a new maximum demand between 60 A and 100 A inclusive, the installer applies before installing and the network operator confirms within 10 working days. The 28 days is the window to notify after a connect-and-notify job. Licence timescales apply to applications above 100 A.

  2. 02A charge point at a house will only ever take power from the grid. Which network route covers telling the DNO about it?
    • AA G99 application, made before any of the work starts
    • BThe ENA process for EV charge points and heat pumps
    • CA building notice, sent to the local building control
    • DA G98 notification, as you would for a small generator

    Why: A charge point that only imports is a load, and goes through the ENA EV charge point and heat pump process: connect and notify within 28 days, or apply first. G98 and G99 are for generation, which only comes in if something exports, such as vehicle-to-grid. Building control deals with the Building Regulations, not the network.

  3. 03Which of these is one of the criteria a domestic job must meet to use the ENA connect-and-notify route?
    • AThe rating of the DNO cut-out is known
    • BThe charge point output is no more than 3.7 kW
    • CThe customer has an approved grant in place
    • DThe property already has a smart meter fitted

    Why: Section B of the form includes: only one additional piece of equipment, DNO cut-out rating known, no concerns over the DNO equipment, not a looped service, a metered supply, maximum demand below the cut-out rating and within 13.8 kVA per phase, and an AC output. A smart meter, a grant or a small output are not criteria.

Common questions

Is the Additional requirements mock exam free?

Yes, it is free with no sign-up needed. Questions are pulled at random from a substantial bank, with a worked explanation on every question after you submit.

Can I retake the mock exam?

Yes. Every attempt picks a different random selection and reshuffles the options, so each retake gives you genuinely new questions. No limit on retakes.

Does this count as a qualification?

No. This is independent practice material and does not award a qualification, card or certificate. Where a subject has a formal qualification or card, you gain it through an approved provider.

Certificate types
19Certificate types
Calculators
70+Calculators
Training courses
46+Training courses
AI specialists
8AI specialists