Free topic-focused mock exam: 25 random questions from a pool of 72 on Inspection, testing and maintenance, drawn from the wider EV Charging Installation bank. 50-minute timer, 60% to pass, worked explanation on every question. Use this when you've taken the full mock once and want to drill the topics you got wrong.

Questions
25
Time limit
50 min
Pass mark
60% · 15/25
Question bank
72

Free, no sign-up. Retake as many times as you like — different questions each time.

Sample questions

  1. 01At handover, a B32 EV circuit on a TN supply measures Zs = 1.05 Ω with the cable cold. Using the Appendix 3 0.8 factor against Table 41.3, what do you conclude?
    • AFails: it is over 0.87 Ω, which is 0.8 × 1.09 Ω
    • BPasses: it is under 1.09 Ω, which is 0.8 × 1.37 Ω
    • CFails: a cold B32 reading must be under 1.00 Ω
    • DPasses only if it is retested later at full load

    Why: Table 41.3 gives 1.37 Ω for a 32 A Type B device. Appendix 3 has the measured value meet Zs(m) ≤ 0.8 × the tabulated value to allow for conductor temperature rise: 0.8 × 1.37 = 1.096, taken down to 1.09 Ω. 1.05 Ω passes. 1.09 Ω is the tabulated B40 value, so 0.87 Ω is the B40 limit, the wrong row.

  2. 02A three-spike test on a rod gives 48 Ω, 50 Ω and 52 Ω with the potential spike at its three positions. What does GN3 say?
    • ARepeat, as all three readings must be equal
    • BRecord 52 Ω, as the highest is the safe value
    • CRepeat, as the spread of 4 Ω is too wide
    • DAccept: the largest deviation is 4% of 50 Ω

    Why: The average is (48 + 50 + 52) ÷ 3 = 50 Ω. The largest deviation is 2 Ω, which is 4% of the average. GN3 says it is inadvisable to accept readings that differ by more than 5%; then you repeat with a larger separation to the current spike. 4% is acceptable.

  3. 03During a three-spike electrode test the soil is very dry and the spikes read high. Where may brine be used to improve contact?
    • AOn the spikes and on the electrode
    • BOn the temporary test spikes only
    • CNowhere, as brine is not permitted
    • DOn the electrode under test only

    Why: GN3 says spike resistance can be reduced by driving the spikes deeper or watering with brine, but in no circumstances should that be used to reduce the resistance of the electrode under test, because it would flatter the reading. Reconnect the earthing conductor before re-energising.

Common questions

Is the Inspection, testing and maintenance mock exam free?

Yes, it is free with no sign-up needed. Questions are pulled at random from a substantial bank, with a worked explanation on every question after you submit.

Can I retake the mock exam?

Yes. Every attempt picks a different random selection and reshuffles the options, so each retake gives you genuinely new questions. No limit on retakes.

Does this count as a qualification?

No. This is independent practice material and does not award a qualification, card or certificate. Where a subject has a formal qualification or card, you gain it through an approved provider.

Certificate types
19Certificate types
Calculators
70+Calculators
Training courses
46+Training courses
AI specialists
8AI specialists