PASMA Training Course OnlineMobile Tower Scaffolding Safety
Study mobile access tower safety at your own pace: the 3T and advance guard-rail build methods, moving a tower, inspection, wind and the law, with quizzes, a mock exam and AI help. Revision support only: this is not a PASMA course and no card is issued.
What Is PASMA, and What Does the Law Require?
PASMA (Prefabricated Access Suppliers and Manufacturers Association) is the trade association for the mobile access tower industry in the UK, and it runs an industry training scheme and card for people who build and use towers. The card is not a legal requirement. The law asks for competence: everyone who builds, moves, inspects or works from a tower must be competent, or be supervised by a competent person while being trained. HSE describes industry training schemes as one way to show competence, and a site or client may ask for a card as its own rule.
Electricians are among the most frequent users of mobile towers. The nature of electrical installation work means that access to ceilings, cable routes, lighting positions, and elevated distribution equipment is a daily requirement. Mobile towers provide a stable, level working platform that allows electricians to work with both hands free, which matters when routing cables, terminating connections, or testing circuits at height. Unlike ladders, a correctly built tower gives collective protection through its guard-rails, room for tools and materials, and can be moved along a workface.
The Work at Height Regulations 2005 require work at height to be properly planned, including for rescue, supervised and done by competent people, with equipment properly inspected. They also set a hierarchy: avoid work at height where reasonably practicable, prevent falls where it cannot be avoided, and minimise the distance and consequences of a fall where the risk remains. Collective protection, such as a tower's guard-rails, takes priority over personal protection, so a correctly built and used tower prevents falls.
What You Will Learn
Tower Types and Components
The parts of a tower and what each one does: frames, braces, platforms and trapdoors, guard-rails, toe-boards, castors, adjustable legs, and stabilisers or outriggers. The tower standards BS EN 1004-1 and BS 1139-6, podiums, and why a missing brace or a part from another maker can lead to collapse.
The 3T (Through the Trap) Assembly Method
The two recognised build methods, through-the-trap (3T) and advance guard-rail (AGR), which both keep you behind guard-rails at every stage, and why the build sequence always comes from the manufacturer instruction manual.
Ground, Height and Stability
Why the maximum height, configuration, stabilisers and safe working load all come from the instruction manual, with no universal base ratio. Firm, level ground, adjustable legs within the limits the manual gives, locked castors, and never bricks or blocks.
Inspection and Maintenance Requirements
Pre-use checks before every use, and formal inspection under regulation 12: after assembly in each position, at suitable intervals and after events, and within 7 days for construction work where a person could fall 2 metres or more. What goes in a Schedule 7 report and how long it is kept.
Moving and Repositioning Towers
Moving a tower safely: nobody and no materials on it, height reduced to 4 m or less (or lower if the manual says), the route checked for overhead obstructions, power lines and uneven ground, moved by hand from the base, and checked again before use.
Environmental Hazards and Wind Limits
No legal wind speed: the limit in the manual, stopping in strong winds, and why sheeting is dangerous. Overhead lines under HSE guidance GS6 (assume live, plan for any work within 10 m), and live equipment: isolate first, because a GRP tower is not a safe way to work near live parts.
Who Is This Course For?
Electricians who assemble and work from mobile towers on commercial and industrial sites for cable installation, lighting, and containment work
Electrical apprentices preparing for site work where they will build towers or work from them
Self-employed electricians who erect their own towers on domestic and small commercial jobs and need to know the law and the manual
Maintenance electricians who use mobile towers regularly for lamp replacement, inspection and testing, and distribution board access
Electricians who already hold a tower training card and want to refresh the law, the build methods and the inspection rules
Site supervisors and contracts managers who need to understand tower safety requirements to properly manage and audit work at height on their projects
Course Structure
The Elec-Mate mobile access towers course has six modules, each of four 25-minute lessons, followed by a mock exam: 20 questions in 30 minutes, drawn from a 180-question bank, with 80% to pass. Each lesson includes study material, quick checks and a quiz. It is revision support, not a PASMA course, and it does not award a card. It pairs well with our manual handling course and working at height training.
The law and choosing the right kit
Who carries which duty, when a tower is the right choice, the tower standards and planning the job.
The tower and its manual
The parts of a tower, reading the instruction manual, ground and castors, and podiums.
Building a tower
The two recognised build methods, through-the-trap and advance guard-rail, and what you never do.
Dismantling, moving and looking after towers
Taking a tower down, moving it safely, damaged parts, and towers from hire firms or other trades.
Using a tower safely as an electrician
Working from the platform, wind and weather, overhead lines and live equipment, and falling objects.
Inspection, emergencies and reporting
Checks before use, formal inspection and reports, rescue, and reporting accidents.
Why Study Mobile Towers with Elec-Mate?
AI-powered study tools, quizzes and a mock exam, and a library of 46+ courses, all from your mobile device.
3T Assembly Method Training
Study material on the two recognised build methods, through-the-trap (3T) and advance guard-rail (AGR), and why both keep the builder behind guard-rails.
Reading the Instruction Manual
Why the configuration, stabilisers, maximum height and safe working load all come from the manufacturer manual, with no universal base ratio.
Inspection and Compliance
Pre-use checks, inspection under regulation 12 after assembly, at intervals and after events, the 7-day rule for construction work, and Schedule 7 reports.
Mock Exam and AI Help
A mock exam of 20 questions in 30 minutes from a 180-question bank, 80% to pass, and an AI study assistant to explain any topic.
Weather and Environmental Hazards
No legal wind speed: the manual limit and strong winds, sheeting, ground conditions, and overhead lines under HSE guidance GS6.
Part of 46+ Training Courses
The mobile access towers course sits within Elec-Mate's library of 46+ courses, including MEWPs, asbestos awareness, working at height, and BS 7671:2018+A4:2026.
In the app
Run Your Electrical Business Smarter with Elec-Mate
Quotes, certificates, job tracking, and team management, built for UK electricians.
Frequently Asked Questions
What is PASMA, and do electricians need a PASMA card?
PASMA stands for the Prefabricated Access Suppliers and Manufacturers Association, the trade association for the mobile access tower industry. It runs an industry training scheme with its own card. A PASMA card is not a legal requirement. The Work at Height Regulations 2005 require everyone who builds, moves, inspects or works from a tower to be competent, or to be supervised by a competent person while being trained, and HSE says towers must be erected and dismantled by trained and competent people. HSE describes industry training schemes as one way to show competence. A site or client may still ask for a tower training card as its own entry rule. Electricians use towers for lighting, containment, fire alarm and CCTV work at height, so the law and the safe methods matter however you show competence. The Elec-Mate mobile access towers course is study and revision support: it is not a PASMA course and does not award a card.
What is the 3T (through-the-trap) method for tower assembly?
HSE recognises two safe ways to build a tower: through-the-trap (3T) and advance guard-rail (AGR). Both keep the builder protected by guard-rails as the tower goes up. With 3T, the builder works seated in the open trapdoor and fits the guard-rails for the level above before standing on that platform, so nobody ever stands on an unguarded platform. With AGR, temporary guard-rail units are locked in place from the level below before anyone gets onto the platform, and are moved up ahead of the builder. HSE expects enough platforms to fit them at about 2 m intervals during assembly and dismantling. The exact build sequence for any tower comes from its manufacturer instruction manual, which the manufacturer, supplier or hirer must provide and which should stay with the tower.
What are the maximum safe working heights for mobile towers?
There is no single legal height limit. The maximum height for a tower, indoors and outdoors, comes from its manufacturer instruction manual and must never be exceeded. The tower standard BS EN 1004-1:2020 covers towers up to 12 m indoors and 8 m outdoors; towers outside its scope, such as over-height or linked towers, are covered by BS 1139-6:2022. Standards are not law, but the manual is written to them. There is no universal base-to-height ratio to work from: HSE says to follow the ratio and configuration in the instruction manual, and to fit the stabilisers or outriggers it specifies for that height.
What inspection requirements apply to mobile towers?
Under regulation 12 of the Work at Height Regulations 2005, a competent person inspects a tower after it is assembled in position and before it is used, at any height. It is also inspected at suitable intervals and after anything that could affect its safety, such as strong winds. For construction work where a person could fall 2 metres or more, a mobile tower must have been inspected on the site within the previous 7 days. For those towers the inspector writes a report, with the particulars in Schedule 7, before the end of the working period and hands it over within 24 hours; it is kept on site until the construction work is completed, then at an office for 3 months. For other towers, each inspection is recorded and kept until the next one is recorded. Moving a tower on the same site does not need a new report, but a pre-use check is needed after every move, and a full inspection and report after it is re-assembled or altered. Before every use, check it: castors locked, level, complete, braces, guard-rails, toe-boards and platforms in place, stabilisers fitted as the manual says, and no damaged parts. Tags are good practice, not a legal requirement.
What wind speed limits apply to mobile towers?
The law gives no wind speed. The Work at Height Regulations 2005 say work at height may only be done when the weather does not jeopardise safety, and HSE says never to use a tower in strong winds. Any wind limit for using, building or moving a tower comes from its manufacturer instruction manual, and you stop sooner if conditions make it unsafe. You may see 17 mph (Beaufort 4) quoted: that is an industry figure used in many manuals, not the law. Never sheet a tower or fix signs or banners to it unless it is designed for that, because sheeting catches the wind; in a case reported by HSE in July 2026, a sheeted tower in Putney overturned in the wind and the company was fined and a director convicted. Never move a tower in windy conditions, and have it checked after strong winds before anyone goes back up.
How long does PASMA training take?
PASMA courses are run by training providers, so check the length, content and price with the provider. The Elec-Mate mobile access towers course is separate: 6 modules of four 25-minute lessons (about 10 hours of study) and a mock exam of 20 questions in 30 minutes, drawn from a 180-question bank, with 80% to pass. It is revision support, not a PASMA course, and it does not award a card. In law there is no expiry date on competence; any refresher period is set by a training scheme, your employer or the site.
Does the Elec-Mate course cover podiums and low-level access?
Yes. Module 2 includes podiums and low-level platforms. Work from a podium is still work at height, because the law has no minimum height. Podium steps are covered by BS 8620, which sets them up for one person, on a platform no higher than 2.5 m, with a maximum load of 150 kg; always follow the manufacturer instructions for the podium you are using. For many low-level electrical jobs a podium is the right choice. For the options and content of PASMA courses, check with a PASMA training provider; the Elec-Mate course is not one of them and does not award a card.
7-day free trial
Start Your Mobile Tower Study Today
Join 2,830+ UK electricians using Elec-Mate for training and professional development. 7-day free trial, cancel anytime.
Start your free trialFrom £6.99/mo after the trial — no charge until day 8.