Understand your legal duties under the Construction (Design and Management) Regulations 2015: who does what, plans and files, design decisions and the rules on site, applied to electrical work from domestic rewires to commercial sites. 5 modules of 4 lessons each, then a mock exam, with an AI tutor.

Free for 7 days · No charge until day 8 · Cancel anytime · Used by 2,600+ UK electricians

13 min readUpdated 2026-10-29Andrew Moore, Founder of Elec-Mate
ShareXinW
Follow

2,600+

UK electricians

“Replaced three separate apps with Elec-Mate. Certs, quotes, and scheduling all in one place.”

Daniel Palmer, DP Electrical · 5 out of 5

Course Overview

Duration
8 hours 50 minutes
Level
Intermediate
Prerequisites
No prior CDM knowledge required. Suitable for all electricians who work on construction projects, including domestic jobs
Modules
6 modules
Certification
CPD certificate on completion, as a record of your CDM awareness training

Who Is This For?

Electricians working on construction sites, self-employed electricians who carry the client's duties on domestic jobs, electricians who design as well as install, supervisors, and small firms that act as principal contractor. This is awareness training, not a principal designer or site manager qualification

Key takeaways

  1. 01The Construction (Design and Management) Regulations 2015 (CDM 2015) apply to all construction projects in Great Britain, including domestic work, whether or not the project is notifiable. Installing, maintaining, repairing or removing electrical services fixed within or to a structure is construction work by definition.
  2. 02CDM 2015 places duties on clients, designers, principal designers, principal contractors and contractors, and workers have duties too. An electrical firm or self-employed electrician is a contractor, and is also a designer when choosing the layout or specification of an installation.
  3. 03As a contractor you must plan, manage and monitor your own work (reg 15(2)), follow the directions of the principal designer and principal contractor and the relevant parts of the construction phase plan where there is more than one contractor (15(3)), only employ or appoint people who have, or are in the process of obtaining, the right skills, knowledge, training and experience (15(7)), and give your workers supervision, instructions and information (15(8)).
  4. 04Every project needs a construction phase plan before the construction phase begins. The principal contractor draws it up or, where there is only one contractor, that contractor does (reg 15(5)). It is sized to the job, and HSE says a simple plan is usually enough for small work.
  5. 05Elec-Mate includes an AI RAMS (risk assessment and method statement) generator for electrical work. CDM itself does not require a method statement; the risk assessment is required by regulation 3 of the Management of Health and Safety at Work Regulations 1999.

Why CDM Matters for Every Electrician

The Construction (Design and Management) Regulations 2015 (SI 2015/51) came into force on 6 April 2015 and set out how health and safety is managed on construction projects in Great Britain. They are made under the Health and Safety at Work etc. Act 1974. The definition of construction work includes the installation, commissioning, maintenance, repair or removal of electrical services fixed within or to a structure, so a consumer unit change is covered as much as a large commercial installation.

Many electricians assume CDM only applies to large or notifiable sites with several contractors, hard hats and site cabins. This is wrong. CDM 2015 applies to all construction work, including domestic projects, whether or not the project is notifiable. What you do is sized to the job, so a domestic rewire needs far less paperwork than a hospital installation, but the law applies whatever the size of the project.

Understanding CDM is about working safely and knowing which duties are yours: as a contractor, as a designer when you choose the layout or specification of an installation, and as the person carrying the client's duties on many domestic jobs. It also helps you work well with clients, principal designers and principal contractors.

The Elec-Mate AI RAMS generator creates risk assessments and method statements for every type of electrical work, from domestic installations to commercial fit-outs and industrial projects.

Duty Holders Under CDM 2015

CDM 2015 places duties on five kinds of duty holder, shown below, and workers have duties too. HSE says one person or organisation can hold more than one role if they have the skills, knowledge and experience for each.

Client

Any person for whom a project is carried out. Must make suitable arrangements for managing the project, including welfare, provide pre-construction information, and appoint the principal designer and principal contractor where there is more than one contractor. On domestic jobs these client duties pass to the contractor, the principal contractor or, by written agreement, the principal designer.

Principal Designer

A designer with control over the pre-construction phase, appointed by the client where there is more than one contractor. Plans, manages and monitors the pre-construction phase, coordinates health and safety during it, and prepares the health and safety file.

Principal Contractor

A contractor appointed by the client where there is more than one contractor. Plans, manages and monitors the construction phase, draws up the construction phase plan, organises cooperation between contractors, and makes sure there is a site induction and welfare.

Designer

Anyone who, in the course of a business, prepares or modifies a design relating to a structure, or to an electrical system intended for one. HSE names an electrician who designs the layout and specification of an installation. Designers must eliminate foreseeable risks so far as is reasonably practicable, otherwise reduce or control them, and pass on information.

Contractor

Anyone who, in the course of a business, carries out, manages or controls construction work. This includes electrical firms, sub-contractors, sole traders and the self-employed. Contractors must plan, manage and monitor their own work. An employed electrician is a worker, with duties to cooperate and report danger.

Principal Designer and Principal Contractor Explained

Where there is more than one contractor, or it is reasonably foreseeable that there will be, the client must appoint a principal designer and a principal contractor in writing. The trigger is the number of contractors, not notification, size or duration. If a commercial client does not appoint them, it must carry out their duties itself; on a domestic job the law fills the roles.

The principal designer plans, manages and monitors the pre-construction phase. It makes sure designers comply with their duties, coordinates health and safety during that phase, helps the client with pre-construction information and passes it on, and prepares the health and safety file. It must be a designer with control over the pre-construction phase, and the law names no qualification for the role. If your electrical work includes design, you must give the principal designer information about risks your design could not eliminate.

The principal contractor plans, manages and monitors the construction phase. It draws up and updates the construction phase plan with its site rules, organises cooperation between contractors (including your electrical team), makes sure there is a suitable site induction, takes steps to prevent unauthorised access, and makes sure welfare facilities are provided. HSE says it does not have to supervise each contractor's work in detail.

As an electrical contractor on a site with other contractors, you must follow the directions of the principal designer and principal contractor and the parts of the construction phase plan relevant to your work, cooperate with others on the site, and report anything likely to endanger anyone. The principal contractor may also ask to see your risk assessments and method statements before you start. HSE says method statements are not required by law, but they are an effective and practical way to help plan, manage and monitor construction work.

In the app

Generate RAMS for your electrical work instantly

The Elec-Mate AI Health and Safety Agent creates professional risk assessments and method statements tailored to your specific project.

The Construction Phase Plan

Every construction project needs a construction phase plan before the construction phase begins, not only large or notifiable ones. Where there is more than one contractor, the principal contractor draws it up before the site is set up and keeps it reviewed and updated. Where there is only one contractor, that contractor draws it up (regulation 15(5)), so on a domestic job where you are the only contractor, the plan is yours to write.

The plan is sized to the job. HSE says a simple plan before the work starts is usually enough for small work, and its CIS80 leaflet gives a template. HSE also says the plan should not include generic risk assessments or detailed method statements, and should be as simple as possible.

What the Plan Covers

  • The health and safety arrangements and site rules for the project (required by regulation 12(2))
  • Specific measures for any Schedule 3 work, such as work near high voltage power lines (required by regulation 12(2))
  • A description of the project, the key people and the health and safety aims (HSE)
  • How people will cooperate, and how workers are involved (HSE)
  • Site induction (HSE)
  • Welfare facilities (HSE)
  • Fire and emergency procedures (HSE)

In the app

Practise with unlimited mock exams

AI-generated mocks, instant marking, and explanations on every question — targeted at your weakest topics. From £6.99/mo.

CDM Documentation: What You Need to Provide

As an electrical contractor, you will be expected to provide documentation to the principal contractor and, in some cases, directly to the client. The key documents are:

Risk assessments and method statements (RAMS) for your electrical work. The law requires a suitable and sufficient risk assessment under regulation 3 of the Management of Health and Safety at Work Regulations 1999, and an employer with five or more employees must record the significant findings. CDM does not require a method statement, although arrangements for demolition or dismantling must be recorded in writing before the work begins (regulation 20(2)). HSE says method statements are not required by law but are an effective way to plan, manage and monitor work.

Competence evidence. The law asks that the people you employ or appoint have, or are in the process of obtaining, the skills, knowledge, training and experience for their tasks (regulation 15(7)). CDM names no card, scheme or qualification, and HSE says sole reliance should not be placed on industry certification cards. Third-party assessment schemes are one way to show competence, but HSE says the law does not require them. Training records, such as safe isolation, asbestos awareness and working at height, help show what your team can do.

Information for the health and safety file on projects with more than one contractor. The principal designer prepares the file and it goes to the client at the end of the project. If you designed part of the installation, you must make sure appropriate information about it goes in the file, and the principal contractor passes relevant information to the principal designer. HSE suggests the file includes the nature, location and markings of significant services, including underground cables, and as-built drawings.

Reporting danger and incidents. Anyone working under another's control must report anything likely to endanger themselves or others to that person (regulation 8(5)). Under RIDDOR (Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 2013), an employer reports reportable injuries to its own employees; for a self-employed person, and for dangerous occurrences, the person in control of the premises reports.

Your Duties as a Contractor Under CDM 2015

Every electrical firm, sub-contractor, sole trader or self-employed electrician who carries out, manages or controls construction work in the course of a business is a contractor under CDM 2015. Contractor duties are in regulation 15, and Part 4 adds general requirements for every construction site. An employed electrician is a worker, who must cooperate with others and report danger (regulations 8(4) and 8(5)). The main contractor duties are:

  • Plan, manage and monitor your work and that of workers under your control so that, so far as is reasonably practicable, it is done without risks to health and safety (15(2)). Before starting, be satisfied that the client is aware of its CDM duties (15(1)).
  • Only employ or appoint competent people. Anyone you employ or appoint to work on a construction site must have, or be in the process of obtaining, the skills, knowledge, training and experience for their tasks (15(7)).
  • Give supervision, instructions and information to each worker under your control, including a site induction where the principal contractor has not provided one, procedures for serious and imminent danger, and the risks from your risk assessment and from other contractors' work (15(8) and 15(9)).
  • Follow the plan and the principal roles. Where there is more than one contractor, follow any directions from the principal designer or principal contractor and the parts of the construction phase plan relevant to your work (15(3)). Where you are the only contractor, draw up the construction phase plan yourself (15(5)).
  • Secure the site and provide welfare. Do not begin work until reasonable steps have been taken to prevent unauthorised access (15(10)), and ensure, so far as is reasonably practicable, that the Schedule 2 welfare requirements are met so far as they affect you and your workers (15(11)).

These duties apply on every project, whatever its size. On a domestic project where you are the only contractor, you also carry the client's duties, sized to the job. On a site with other contractors, you work within the arrangements set by the principal contractor, but you remain responsible for managing your own work safely, and anyone working under another's control must report to that person anything likely to endanger their own or others' health and safety (8(5)).

In the app

Professional RAMS for every project

Elec-Mate's AI Health and Safety Agent generates task-specific risk assessments and method statements in minutes.

Course Modules

1

What CDM is and when it applies

What CDM 2015 is, what counts as construction work, when the principal roles and notification apply, and domestic jobs.

2

Who does what

The client, designers and the principal designer, the principal contractor, contractors and workers.

3

Plans, information and files

Pre-construction information, the construction phase plan, the health and safety file, and the paperwork the law asks for.

4

Design and the electrician

Designers' duties in practice, electrical design decisions that change risk, working with the principal designer, and the Building Regulations roles.

5

On site: the construction phase

Inductions and competence, welfare facilities, electrical hazards on site, and enforcement, reporting and scenarios.

6

Mock exam

20 questions drawn from a 150-question bank, with 30 minutes to answer them. The pass mark is 80%.

What You Get With Elec-Mate

AI Study Assistant

Ask any CDM question in plain English. Get detailed answers on duty holder responsibilities, construction phase plans…

Video Content

Clear video explanations of CDM roles, documentation requirements, and practical application for electricians. Watch on any device.

Interactive Quizzes

Test your understanding with scenario-based questions. Identify duty holders, determine documentation requirements…

Study Planner

Set your target completion date and Elec-Mate creates a personalised study schedule. Complete CDM training at your own pace.

Flashcard Decks

Spaced repetition flashcards covering duty holder roles, construction phase plan requirements, documentation types, and key CDM terminology.

AI RAMS Generator

Elec-Mate AI Health and Safety Agent generates professional risk assessments and method statements for your electrical work, so you can create project-specific RAMS…

Frequently Asked Questions

Trusted by electricians across the UK

Real feedback from electricians and apprentices

“Replaced three separate apps with Elec-Mate. Certs, quotes, and scheduling all in one place.”

Daniel Palmer

Sole Trader · DP Electrical

“I've won two contracts this month because I could turn quotes around same-day with the AI cost engineer.”

Nathan Perry

Electrician · NP Electrical Services

“The study centre got me through my AM2. Mock exams and flashcards are brilliant.”

Jake Pizey

3rd Year Apprentice · Apprentice

7-day free trial

Understand your CDM duties and work with confidence

Join 2,830+ UK electricians studying smarter with Elec-Mate. CDM modules, AI RAMS generator, and an AI tutor for any health and safety question. 7-day free trial, cancel anytime.

Start your free trial

From £6.99/mo after the trial — no charge until day 8.

“Replaced three separate apps with Elec-Mate. Certs, quotes, and scheduling all in one place.”

Daniel Palmer, DP Electrical · 5 out of 5
  • 7 days free, then from £6.99/mo
  • Cancel in one tap — no calls, no hassle
  • iOS, Android and web
  • Built to BS 7671:2018+A4:2026

Or download the app

Download on the App StoreGet it on Google Play
Certificate types
19Certificate types
Calculators
70+Calculators
Training courses
46+Training courses
AI specialists
8AI specialists